What size mainline should feed a drip manifold?

Size for total zone GPM with low friction loss—often polyethylene lateral fed from ¾" or 1" PVC/poly after the valve. Keep velocities moderate and support pipes against heat expansion.

More in Drip

Still stuck? Contact us with a photo of the part label — we confirm fit within one business day.